EPC Intel
EPC Intel

Global waste to energy pipeline builds toward US$ 58.8 billion by 2036

The global waste to energy market is entering a sustained growth phase, driven by rising urban waste volumes, tightening landfill regulations, and increasing demand for low carbon power. With the market projected to nearly double by 2036, EPC contractors and equipment suppliers are positioning for a new wave of thermal and biological plant investments worldwide.

The global waste to energy market is entering a decisive growth cycle. Valued at US$ 30.7 billion in 2025 and forecast to reach US$ 58.8 billion by 2036 at a CAGR of 6.1 percent, the sector is no longer a niche waste solution. It is becoming a core infrastructure play, blending renewable power, environmental compliance, and long term municipal contracting.

For EPC contractors, technology licensors, and key equipment suppliers, the next decade will be defined by large scale thermal plants in mature markets and modular, distributed facilities in emerging economies.

Market structure and regional momentum

Europe led the market in 2025 with 39.5 percent of global revenue, followed by Asia Pacific at 30.5 percent and North America at 20.8 percent. Municipal solid waste accounted for 65.5 percent of total feedstock, underscoring the dominance of urban waste streams.

Policy frameworks remain the backbone of the sector. European landfill diversion mandates, renewable energy incentives, and district heating integration continue to support new capacity. In Asia, rapid urbanization and shrinking landfill capacity are pushing governments toward WtE as a dual solution for waste and baseload power.

Indonesia’s launch of 34 new WtE projects in early 2026, alongside international bidding for seven plants worth US$ 5.6 billion, highlights the scale of public sector commitment now entering procurement phases.

Technology pathways and plant configurations

WtE projects typically fall into three main categories, thermal treatment, biological treatment, and hybrid systems.

Incineration remains the dominant technology for large municipal plants, particularly in Europe and Japan. Gasification and pyrolysis are gaining traction due to improved efficiency and lower emissions profiles.

A typical 25 to 40 MW mass burn facility processing 300,000 to 500,000 tonnes per year can carry an EPC value in the range of US$ 250 million to US$ 450 million, depending on flue gas treatment standards and grid integration complexity.

Capital spend breakdown for a conventional incineration plant generally follows:

  • Boiler island and combustion system, 25 to 30 percent

  • Flue gas cleaning and emission control, 20 to 25 percent

  • Steam turbine and generator package, 10 to 15 percent

  • Civil works and buildings, 15 to 20 percent

  • Balance of plant, electrical, and control systems, 15 to 20 percent

Emission control packages alone can exceed US$ 80 million on larger European plants, creating strong subcontracting opportunities for filtration, scrubber, and stack monitoring suppliers.

Biological treatment

Anaerobic digestion and fermentation are expanding in agricultural and food waste segments. These plants are typically smaller, ranging from 2 to 15 MW equivalent output, with EPC values between US$ 20 million and US$ 120 million.

Here, digesters, gas upgrading units, and storage tanks dominate capital allocation. Gas upgrading systems and compression packages can represent 15 to 25 percent of total plant cost, offering opportunities for specialist OEMs.

Key industry players and competitive landscape

The market remains relatively consolidated at the top tier. Major players include Veolia Environnement S.A., SUEZ, Kanadevia Inova, Mitsubishi Heavy Industries, Ltd., Waste Management Inc., Babcock & Wilcox, Keppel Seghers, and Covanta Holding Corporation.

These companies combine proprietary combustion or gasification technologies with integrated EPC delivery models. Increasingly, they are also offering long term O and M contracts, often 15 to 25 years, bundled with EPC execution.

For subcontractors, opportunities are concentrated in:

  • Flue gas desulfurization and NOx reduction systems

  • High pressure boilers and pressure parts fabrication

  • Turbine generator supply

  • Waste handling cranes and feed systems

  • Ash treatment and metal recovery units

  • Digital monitoring and control platforms

Commercial models and bankability

Revenue streams typically combine tipping fees and power sales. In many European projects, tipping fees represent 50 to 70 percent of total revenue, stabilizing cash flow and improving project finance metrics.

Long term municipal waste supply agreements, often 20 years or more, are critical for bankability. In emerging markets, sovereign guarantees or public private partnership structures are becoming more common to mitigate feedstock and payment risks.

The 10 year US$ 704 million operations contract secured in Florida in late 2025 demonstrates the growing scale of O and M outsourcing alongside new build EPC.

Challenges and risk factors

Despite robust fundamentals, high upfront capital intensity remains a barrier. Large scale thermal plants require complex permitting, environmental impact assessments, and community engagement programs.

Advanced emission control systems are now mandatory in most OECD markets. While this raises capex, it also creates premium packages for specialized suppliers.

Community acceptance continues to be a decisive factor. Developers that integrate transparent emission monitoring and district heating benefits into project design are more likely to secure approvals.

Outlook to 2036

The trajectory toward US$ 58.8 billion by 2036 reflects structural drivers, rising waste volumes, decarbonization targets, and energy security concerns.

Asia Pacific, Latin America, and the Middle East and Africa are expected to account for a growing share of new EPC awards. Modular and decentralized plants will gain prominence in secondary cities where grid infrastructure and landfill space are constrained.

For EPC contractors tracking the pipeline, the waste to energy sector offers a steady flow of medium to large ticket projects, with typical EPC values ranging from US$ 50 million for small anaerobic digestion units to over US$ 500 million for large urban incineration complexes.

As governments push landfill diversion targets higher and renewable capacity targets become stricter, WtE is moving from policy experiment to infrastructure necessity. For the supply chain, the next decade will be about execution discipline, emissions performance, and securing long term waste feedstock in a competitive market.

Related insights

Global waste to energy pipeline builds toward US$ 58.8 billion by 2036

The global waste to energy market is entering a sustained growth phase, driven by rising urban waste volumes, tightening landfill regulations, and increasing demand for low carbon power. With the market projected to nearly double by 2036, EPC contractors and equipment suppliers are positioning for a new wave of thermal and biological plant investments worldwide.

Aramco's Jafurah expansion reshapes Middle East gas contracting landscape

Saudi Arabia’s Jafurah Gas Basin is emerging as one of the world’s most significant unconventional gas developments, anchoring a multi billion dollar EPC wave across processing, compression, pipelines and NGL infrastructure as the Kingdom targets 2 billion scfd of sales gas by 2030.
Show all